S-1: Difference between revisions
No edit summary |
No edit summary |
||
Line 18: | Line 18: | ||
<div style="text-align: justify;"><span style="color:#00008B">CDR Vincent John Moore was XO of the USS S-1 (SS-105) in 1921. He later became the CO of the USS [[R-9|'''R-9 (SS-86)''']]. He was a graduate of Annapolis, Class of 1917. He served on board USS Pennsylvania (BB-38) when it went to Europe with President Wilson to sign treaty ending WWI. CDR Moore retired from the Navy in 1924 due to health reasons. He was recalled to active duty in 1942 as an instructor. He passed away on Dec. 9, 1973. | <div style="text-align: justify;"><span style="color:#00008B">CDR Vincent John Moore was XO of the USS S-1 (SS-105) in 1921. He later became the CO of the USS [[R-9|'''R-9 (SS-86)''']]. He was a graduate of Annapolis, Class of 1917. He served on board USS Pennsylvania (BB-38) when it went to Europe with President Wilson to sign treaty ending WWI. CDR Moore retired from the Navy in 1924 due to health reasons. He was recalled to active duty in 1942 as an instructor. He passed away on Dec. 9, 1973. | ||
<small>Photo provide by his | <small>Photo provide by his grandniece, Patricia M. Lynn.</small> | ||
[[File:Red bar sub new.jpg]] | [[File:Red bar sub new.jpg]] |
Revision as of 06:39, 19 December 2023
Photo in the private collection of Ric Hedman
Photo courtesy of the Boston Public Library, Leslie Jones Collection. Used with permission.
Photo provide by his grandniece, Patricia M. Lynn.
Newspaper Photo Caption: THE FIRST SUBMARINE AIRPLANE IS TESTED OFF NEW LONDON
New London, Connecticut -- The United States Navy held the first tryout of the "Peanut Plane" off New London resently. It is a tiny 3 cylinder airplane installed in a waterproof casing on the deck of the US Submersible S-1 and can be launched in the short time of 9 minutes. The plane weighs only 1000 pounds and is flown by the first "Submarine Pilot" Lt. Dolph C. Allen. Photo shows the plane completely assembled and ready for flight, which launched by lowering the stern of the submarine. 9-2-26
The first full cycle of surfacing, assembly, launching, retrieving, disassembly, and submergence took place on 28 July 1926 on the Thames River at New London.
News Photo in the private collection of Ric Hedman
U.S. Navy photo
NHHC photo NH 99774.
Photo in the private collection of Ric Hedman
U.S. Navy photo
Photos in the private collection of Ric Hedman
Photos in the private collection of Ric Hedman
Photo in the private collection of Ric Hedman
Photo in the private collection of Ric Hedman
Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster at pigboats dot com