N-class: Difference between revisions
From PigBoats.COM
Pbcjohnston (talk | contribs) |
Pbcjohnston (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
=== <big>N-1 (Submarine No. 53, later SS-53)</big> === | === <big>N-1 (Submarine No. 53, later SS-53)</big> === | ||
<div style="text-align: justify;"><span style="color:#00008B"> | [[File:N-1 down thames river.jpg|left|500px|Photo in the private collection of Ric Hedman.]] | ||
<div style="text-align: justify;"><span style="color:#00008B">USS N-1 traveling down the Thames River circa spring of 1918. She is yet to get her steel chariot bridge fairwater installed. The man forward of the periscope sheers, standing on the bridge access hatch, is the helmsman. Her starboard engine is still a little cold, as it is smoking excessively. | |||
Behind, on the shore, can be seen the Fort Griswold Monument and Fort Griswold itself, to the left of the large smoke stack. Fort Griswold is a revolutionary war fort that was the scene of a bloody massacre by the British on American forces. Survivors were taken from the fort and placed on prison ships moored in the Thames River. | |||
The building with the large smokestack is yet to be identified. It is north, or upriver from the present location of the Electric Boat Company where submarines are still built.</span></div> | |||
[[N-1|See more N-1 photos]] | [[N-1|See more N-1 photos]] | ||
Line 14: | Line 19: | ||
=== <big>N-2 (Submarine No. 54, later SS-54)</big> === | === <big>N-2 (Submarine No. 54, later SS-54)</big> === | ||
<div style="text-align: justify;"><span style="color:#00008B"> | [[File:N-2 port side.jpg|left|500px|Photo NH 45625 courtesy of NHHC.]] | ||
<div style="text-align: justify;"><span style="color:#00008B">N-2 operating in the Atlantic in the early 1920's. She has one engine lit off and is barely making steerageway. Her torpedo loading crane is in place on the forward deck.</span> | |||
[[N-2|See more N-2 photos]] | [[N-2|See more N-2 photos]] | ||
Line 21: | Line 27: | ||
=== <big>N-3 (Submarine No. 55, later SS-55)</big> === | === <big>N-3 (Submarine No. 55, later SS-55)</big> === | ||
<div style="text-align: justify;"><span style="color:#00008B"> | [[File:N-3 in the St Lawrence.jpg|left|500px|Photo NH 81354 courtesy of NHHC.]] | ||
<div style="text-align: justify;"><span style="color:#00008B">N-3 was one of the first submarines to operate in the Great Lakes. She is seen here in the St. Lawrence River enroute to Toledo, Ohio in June 1921.</span> | |||
[[N-3|See more N-3 photos]] | [[N-3|See more N-3 photos]] | ||
Line 28: | Line 35: | ||
=== <big>N-4 (Submarine No. 56, later SS-56)</big> === | === <big>N-4 (Submarine No. 56, later SS-56)</big> === | ||
<div style="text-align: justify;"><span style="color:#00008B"> | [[File:N-4 port bow.jpg|left|500px|Photo NH 45628 courtesy of NHHC.]] | ||
<div style="text-align: justify;"><span style="color:#00008B">N-4 is seen here at the mouth of the Thames River, Connecticut in 1919. Her crew are pulling out and preparing mooring lines as she heads upriver to Submarine Base New London.</span> | |||
[[N-4|See more N-4 photos]] | [[N-4|See more N-4 photos]] | ||
Line 35: | Line 43: | ||
=== <big>N-5 (Submarine No. 57, later SS-57)</big> === | === <big>N-5 (Submarine No. 57, later SS-57)</big> === | ||
<div style="text-align: justify;"><span style="color:#00008B"> | [[File:N-5 port side.jpg|left|500px|Photo 80-G-1025033 via NARA.]] | ||
<div style="text-align: justify;"><span style="color:#00008B">N-5 underway in the Thames River, Connecticut enroute to Submarine Base New London, approximately 1919. The original photo was not in good shape and has several creases and wrinkles.</span> | |||
[[N-5|See more N-5 photos]] | [[N-5|See more N-5 photos]] | ||
Line 42: | Line 51: | ||
=== <big>N-6 (Submarine No. 58, later SS-58)</big> === | === <big>N-6 (Submarine No. 58, later SS-58)</big> === | ||
<div style="text-align: justify;"><span style="color:#00008B"> | [[File:N-6 on trials 1918.jpg|left|500px|An original Navy photo in the private collection of Ric Hedman.]] | ||
<div style="text-align: justify;"><span style="color:#00008B">The yet to be commissioned N-6 is seen here running the measured mile at Provincetown, MA. at the tip of Cape Cod. The N-6 turned in a recorded speed of 10.5 knots on her 12th run. The date was April 16, 1918. At this point she was still owned by the Lake Torpedo Boat Company and was being operated by civilian yard personnel. Portions of her crew were onboard for training, and it is likely that her soon to be commanding officer, Lieutenant Commander Herbert R. Hein was aboard. These "builder's trials" were intended to show the Navy that the company had built the product to specifications, and were required before the Navy would accept the boat and commission her into active service.</span> | |||
[[N-6|See more N-6 photos]] | [[N-6|See more N-6 photos]] | ||
Line 49: | Line 59: | ||
=== <big>N-7 (Submarine No. 59, later SS-59)</big> === | === <big>N-7 (Submarine No. 59, later SS-59)</big> === | ||
<div style="text-align: justify;"><span style="color:#00008B"> | [[File:N-7 with O-boat.jpg|left|500px|Photo 19-N-886 from NARA via Navsource.org]] | ||
<div style="text-align: justify;"><span style="color:#00008B">N-7 is shown here under construction at the Lake company yard in Bridgeport, CT., April 1, 1918. She is moored next to an unidentified O-class submarine, with another O-boat across the pier. Lake had both classes under construction at the same time. N-7 is setting high in the water in her incomplete state. The Lake design used an oblong oval shaped deck hatch that covered the torpedo loading hatch. The deck hatch can be seen her raised forward of the conning tower fairwater. Note that the Lake N-boats were built with the chariot bridge installed. The EB design boats had them backfitted after commissioning. </span> | |||
[[N-7|See more N-7 photos]] | [[N-7|See more N-7 photos]] | ||
Line 58: | Line 69: | ||
[[File:N-class 1 2 & 3 1918.jpg|left|500px|U.S. Navy photo.]] | [[File:N-class 1 2 & 3 1918.jpg|left|500px|U.S. Navy photo.]] | ||
<div style="text-align: justify;"><span style="color:#00008B">N-1, N-2, and N-3 moored to the USS Savannah (AS- 8) at Submarine Base New London, | <div style="text-align: justify;"><span style="color:#00008B">N-1, N-2, and N-3 moored to the [https://www.navsource.org/archives/09/36/3608.htm '''USS Savannah (AS- 8)'''] at Submarine Base New London, Groton, CT. on February 7, 1918. In the water between the Savannah and the subs and between the submarines can be seen chunks of floating ice on the Thames River. An unnamed Stewards Mate or Mess Attendant looks at the camera and becomes part of history. | ||
[[General N-class photos|See more general N-class photos]] | [[General N-class photos|See more general N-class photos]] |
Latest revision as of 15:25, 29 November 2024
Design, Construction, and Naming Notes
The N-class submarines were authorized in Fiscal Year 1915 appropriations. The congressional budget committee, in order to be able to afford a fleet submarine (later to be the T-class) in that year's appropriations, reduced the amount of money available for coastal submarines by over $100,000 per unit. This dictated that the FY-15 coastal submarines be smaller, and thus the N-class was born. These boats were over 100 tons smaller than the preceding L-class and would be the smallest submarines built for the USN from this point until 1952. As usual, the Navy split the order of seven boats between Electric Boat and Lake. EB would get N-1 through N-3 and these would be built in Seattle by Todd Dry Dock & Construction Company. Lake would build N-4 through N-7 at his yard in Bridgeport, CT. They conducted brief anti U-boat patrols off the New England coast in WWI, and then served in a training role out of New London until they were decommissioned. Overall, these boats ended up being too small to be really useful, with the EB versions averaging only 8.5 years of service. The Lake versions seemed to have been particularly disliked for poor detail design, habitability, and overall unreliability. They were discarded after only 3.5 years of service in the early 1920's.
N-1 (Submarine No. 53, later SS-53)
USS N-1 traveling down the Thames River circa spring of 1918. She is yet to get her steel chariot bridge fairwater installed. The man forward of the periscope sheers, standing on the bridge access hatch, is the helmsman. Her starboard engine is still a little cold, as it is smoking excessively.
Behind, on the shore, can be seen the Fort Griswold Monument and Fort Griswold itself, to the left of the large smoke stack. Fort Griswold is a revolutionary war fort that was the scene of a bloody massacre by the British on American forces. Survivors were taken from the fort and placed on prison ships moored in the Thames River.
The building with the large smokestack is yet to be identified. It is north, or upriver from the present location of the Electric Boat Company where submarines are still built.N-2 (Submarine No. 54, later SS-54)
N-2 operating in the Atlantic in the early 1920's. She has one engine lit off and is barely making steerageway. Her torpedo loading crane is in place on the forward deck.
N-3 (Submarine No. 55, later SS-55)
N-3 was one of the first submarines to operate in the Great Lakes. She is seen here in the St. Lawrence River enroute to Toledo, Ohio in June 1921.
N-4 (Submarine No. 56, later SS-56)
N-4 is seen here at the mouth of the Thames River, Connecticut in 1919. Her crew are pulling out and preparing mooring lines as she heads upriver to Submarine Base New London.
N-5 (Submarine No. 57, later SS-57)
N-5 underway in the Thames River, Connecticut enroute to Submarine Base New London, approximately 1919. The original photo was not in good shape and has several creases and wrinkles.
N-6 (Submarine No. 58, later SS-58)
The yet to be commissioned N-6 is seen here running the measured mile at Provincetown, MA. at the tip of Cape Cod. The N-6 turned in a recorded speed of 10.5 knots on her 12th run. The date was April 16, 1918. At this point she was still owned by the Lake Torpedo Boat Company and was being operated by civilian yard personnel. Portions of her crew were onboard for training, and it is likely that her soon to be commanding officer, Lieutenant Commander Herbert R. Hein was aboard. These "builder's trials" were intended to show the Navy that the company had built the product to specifications, and were required before the Navy would accept the boat and commission her into active service.
N-7 (Submarine No. 59, later SS-59)
N-7 is shown here under construction at the Lake company yard in Bridgeport, CT., April 1, 1918. She is moored next to an unidentified O-class submarine, with another O-boat across the pier. Lake had both classes under construction at the same time. N-7 is setting high in the water in her incomplete state. The Lake design used an oblong oval shaped deck hatch that covered the torpedo loading hatch. The deck hatch can be seen her raised forward of the conning tower fairwater. Note that the Lake N-boats were built with the chariot bridge installed. The EB design boats had them backfitted after commissioning.
General N-class and group photos
N-1, N-2, and N-3 moored to the USS Savannah (AS- 8) at Submarine Base New London, Groton, CT. on February 7, 1918. In the water between the Savannah and the subs and between the submarines can be seen chunks of floating ice on the Thames River. An unnamed Stewards Mate or Mess Attendant looks at the camera and becomes part of history.
Return to the Submarine Classes page
See more general N-class photos
Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster at pigboats dot com