G-2: Revision history

From PigBoats.COM

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

21 March 2024

24 August 2023

16 July 2023

13 July 2023

14 June 2023

10 May 2023

6 May 2023

5 May 2023

4 May 2023

7 April 2023

22 March 2023

20 March 2023

15 March 2023

28 February 2023

27 February 2023

21 February 2023

  • curprev 01:3001:30, 21 February 2023Pbc captain talk contribs 7,606 bytes +7,606 Created page with "thumb|400px The USS G-2 during her fitting out phase of construction. She is probably pretty close to being completed by the time this photo was taken. The small deck over the torpedo tube outer door has not been installed at this time. There is a man working over the side on the starboard side. He has his feet on a scaffolding board slung over the side and is crouched down. There is another workman going over the port side of the hull..."