G-2

From PigBoats.COM
Revision as of 17:50, 15 March 2023 by Pbc captain (talk | contribs)

Right: The USS G-2 during her fitting out phase of construction. She is probably pretty close to being completed by the time this photo was taken. The small deck over the torpedo tube outer door has not been installed at this time. There is a man working over the side on the starboard side. He has his feet on a scaffolding board slung over the side and is crouched down. There is another workman going over the port side of the hull and a man standing on the top of the conning tower.

USS G-2 tied outboard the USS G-4. New London Submarine Base, 1917.



This is a hand tinted picture of the G-2.

The bow of the USS G-2 as seen from the bridge. The date is unknown but could possibly be circa 1915 to 1919. There is little to no detail that could place the photo. She is possibly making a speed run of some sort.


Aliquam ut lacus non urna ornare semper. Praesent pellentesque pulvinar felis, quis dignissim metus laoreet sed. Proin eleifend ligula at porttitor porta.


Sed aliquam velit cursus elit egestas, vitae rhoncus diam iaculis. Phasellus placerat, risus a commodo rutrum, mi justo ornare leo, at euismod orci est vel arcu.



Lost Crews

Last Name First Name Rank Submarine Date Reason
Henderson Arnold G. EM2 USS G-2 (SS-27) 30-Jul-19 Foundered in Long Island Sound after explosive tests.
Kervin Doyle EM2
Uhlic Sidney D. GM3