L-9: Difference between revisions

From PigBoats.COM
mNo edit summary
(Added photos and captions)
Line 1: Line 1:
[[File:L-Boat Header 1.jpg]]
[[File:L-Boat Header 1.jpg]]


<div style="text-align: justify;"><span style="color:#00008B">
[[File:L-9 under tow.jpg|left|500px]]
<div style="text-align: justify;"><span style="color:#00008B">L-9 shown here setting up to be towed to Ponta Delgada, Azores so that she could enter the war zone off Europe. December 4, 1917. The fleet tug USS Lykens (Fleet Tug No. 56) is likely nearby as the towing vessel. Her towing line would part three days later and L-9, battered by heavy seas, would be forced to return to Boston, arriving on December 13. After repairs and reconditioning, she finally joined her sister boats in Ireland on February 21, 1918 and promptly began running anti U-boat patrols.
 
<small>Photo in the private collection of Ric Hedman.</small>
 
[[File:Red bar sub.jpg]]
 
[[File:L-9 and L-3 bridges.jpg|left|500px]]
 


<small>Library of Congress Collection</small>


[[File:Red bar sub.jpg]]
[[File:Red bar sub.jpg]]

Revision as of 16:08, 9 October 2023

L-9 shown here setting up to be towed to Ponta Delgada, Azores so that she could enter the war zone off Europe. December 4, 1917. The fleet tug USS Lykens (Fleet Tug No. 56) is likely nearby as the towing vessel. Her towing line would part three days later and L-9, battered by heavy seas, would be forced to return to Boston, arriving on December 13. After repairs and reconditioning, she finally joined her sister boats in Ireland on February 21, 1918 and promptly began running anti U-boat patrols.

Photo in the private collection of Ric Hedman.


Return to the L-class page | Return to the Submarine Classes page

Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster at pigboats dot com