O-1: Difference between revisions

From PigBoats.COM
mNo edit summary
(Updated photo and added caption)
 
Line 1: Line 1:
[[File:Header Plans.jpg]]
[[File:Header Plans.jpg]]


[[File:O-1 launch.jpg|left|500px]]
[[File:O-1 dd 1918.jpg|left|500px]]
<div style="text-align: justify;"><span style="color:#00008B">O-1 in drydock at the Portsmouth Navy Yard, Kittery, ME., September 5, 1918. The Navy's Bureau of Construction & Repair (C&R) was able to obtain a license from Electric Boat to build two submarines to their design at Navy yards. O-1 was one of them.  She is shown here two months before her commissioning, undergoing final work in preparation to be accepted by the Navy.


[[File:O-1 drawing.jpg|left|500px]]
<small>Photo NH 46712 courtesy of NHHC.</small>
[[File:O-1 trim and drain system.jpg|left|500px]]
 
 
<div style="text-align: justify;"><span style="color:#00008B">
 
<small>Photo in the private collection of Ric Hedman</small>


[[File:Red bar sub new.jpg]]
[[File:Red bar sub new.jpg]]

Latest revision as of 15:32, 2 October 2023

O-1 in drydock at the Portsmouth Navy Yard, Kittery, ME., September 5, 1918. The Navy's Bureau of Construction & Repair (C&R) was able to obtain a license from Electric Boat to build two submarines to their design at Navy yards. O-1 was one of them. She is shown here two months before her commissioning, undergoing final work in preparation to be accepted by the Navy.

Photo NH 46712 courtesy of NHHC.

Return to the O-class page | Return to the Submarine Classes page

Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster at pigboats dot com