R-21 through R-27: Difference between revisions
From PigBoats.COM
Pbcjohnston (talk | contribs) (Added R-21 photo) |
Pbcjohnston (talk | contribs) (Added R-22 photo) |
||
Line 10: | Line 10: | ||
=== <big>R-22 (SS-99)</big> === | === <big>R-22 (SS-99)</big> === | ||
[[File:R-22 port side.jpeg|left|500px|Photo 19-N-10666 via NARA]] | |||
<div style="text-align: justify;"><span style="color:#00008B">R-22 underway 1920-1922, probably in the Thames River, CT. south of the Submarine Base in Groton. Unlike the EB design R-boats, the Lake design stowed the gun with it pointed forward.</span> | |||
[[R-22|See more R-22 photos]] | [[R-22|See more R-22 photos]] |
Revision as of 20:46, 29 September 2023
R-21 (SS-98)
R-21 underway in Yellow Mill Channel off Bridgeport, CT. shortly after her commissioning in June, 1919. Note that the 3"/50 caliber deck gun has not yet been installed.
R-22 (SS-99)
R-22 underway 1920-1922, probably in the Thames River, CT. south of the Submarine Base in Groton. Unlike the EB design R-boats, the Lake design stowed the gun with it pointed forward.
Return to the R-class page | Return to the Submarine Classes page
R-23 (SS-100)
R-24 (SS-101)
R-25 (SS-102)
R-26 (SS-103)
R-27 (SS-104)
Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster at pigboats dot com