G-class: Difference between revisions

From PigBoats.COM
(Reformatting 3)
Line 2: Line 2:
[[File:G-Boat Header 2.jpg|center]]
[[File:G-Boat Header 2.jpg|center]]
=== <big>Design, Construction, and Naming Notes</big> ===
=== <big>Design, Construction, and Naming Notes</big> ===
<div style="text-align: justify;"><span style="color:#00008B">The four G-class submarines were not actually a class at all. They were built to four completely different designs, but they were intended to have similar military characteristics, so they were grouped together. They were named Seal, Tuna, Turbot, and Thrasher when ordered, but their names were all changed to the G-class names on November 17, 1911, well before any of them had been commissioned. G-1 and G-2 were of a related Lake Torpedo Boat Co. design and were built by the Newport News Shipbuilding & Drydock Co. in Newport News, VA. G-3 was of a modified Lake design whose construction was started at the Lake company yard in Bridgeport, CT. Lake ran into severe financial difficulties and declared bankruptcy, so G-3 had to be towed to the New York Navy Yard for completion. G-4 was an ill-advised attempt to introduce competition to the submarine acquisition process, being built to the Italian Laurenti design at William Cramp & Sons Shipbuilding Co. in Philadelphia, PA. Due to the haphazard process that the Navy used to award the contracts, the hull numbers assigned to these boats fell out of sequence. None of these boats were considered successful, spending an average of just six years in service before being decommissioned and disposed of.</span><br><br>
<div style="text-align: justify;"><span style="color:#00008B">The four G-class harbor defense submarines were not actually a class at all. They were built to four completely different designs, but they were intended to have similar military characteristics, so they were grouped together. They were named Seal, Tuna, Turbot, and Thrasher when ordered, but their names were all changed to the G-class names on November 17, 1911, well before any of them had been commissioned. G-1 and G-2 were of a related Lake Torpedo Boat Co. design and were built by the Newport News Shipbuilding & Drydock Co. in Newport News, VA. G-3 was of a modified Lake design whose construction was started at the Lake company yard in Bridgeport, CT. Lake ran into severe financial difficulties and declared bankruptcy, so G-3 had to be towed to the New York Navy Yard for completion. G-4 was an ill-advised attempt to introduce competition to the submarine acquisition process, being built to an Italian Laurenti design at William Cramp & Sons Shipbuilding Co. in Philadelphia, PA. Due to the haphazard process that the Navy used to award the contracts, the hull numbers assigned to these boats fell out of sequence. None of these boats were considered successful, spending an average of just six years in service before being decommissioned and disposed of.</span><br><br>
<div style="text-align: justify;"><span style="color:#00008B">G-1 represents a unique anomaly in the USN. Her development and construction was so troubled that the Navy was very unsure if they would even accept it. When it did eventually pass acceptance trials, the Navy awkwardly assigned it hull number 19½, the only time in its entire history that the Navy assigned half a hull number to a commissioned warship. When the USS F-1 (Submarine No. 20) was lost in a collision, the Navy took another unprecedented step and reassigned the F-1's hull number to G-1! She was eventually redesignated in the SS series, but not long after she was disposed of as a depth charge target</span>
<div style="text-align: justify;"><span style="color:#00008B">G-1 represents a unique anomaly in the USN. Her development and construction was so troubled that the Navy was very unsure if they would even accept it. When it did eventually pass acceptance trials, the Navy awkwardly assigned it hull number 19½, the only time in its entire history that the Navy assigned half a hull number to a commissioned warship. When the USS F-1 (Submarine No. 20) was lost in a collision, the Navy took another unprecedented step and reassigned the F-1's hull number to G-1. She was eventually redesignated in the SS series, but not long after she was disposed of as a depth charge target</span>
[[File:Red bar sub.jpg]]<br>
[[File:Red bar sub.jpg]]<br>


=== <big>G-1 (Submarine No. 19 1/2, later SS-20)</big> ===
=== <big>G-1 (Submarine No. 19½, later SS-20)</big> ===
[[File:Seal 1.jpg|left|thumb|300x300px|Submarine Seal, February 8, 1911.]]
[[File:Seal 1.jpg|left|thumb|300x300px|Submarine Seal, February 8, 1911.]]
<div style="text-align: justify;"><span style="color:#00008B">Simon Lake's submarine Seal is shown here shortly after her launch from Newport News Shipbuilding, Virginia on February 8, 1911. It would be nearly another two years before she was commissioned into the United States Navy, and then only reluctantly. During this fitting out period her name was changed to G-1.</span><br><br>   
<div style="text-align: justify;"><span style="color:#00008B">Simon Lake's submarine Seal is shown here shortly after her launch from Newport News Shipbuilding, Virginia on February 8, 1911. It would be nearly another two years before she was commissioned into the United States Navy, and then only reluctantly. During this fitting out period her name was changed to G-1.</span><br><br>   
[[G-1|See More G-1 photos]]<br><br><br><br><br><br>
[[G-1|See more G-1 photos]]<br><br><br><br><br><br>
[[File:Red bar sub.jpg]]<br>
[[File:Red bar sub.jpg]]<br>
=== <big>G-2 (Submarine No. 27) ===
=== <big>G-2 (Submarine No. 27)</big> ===
<gallery mode="packed" heights="170px">
<gallery mode="packed" heights="170px">
File:G2-g2bny1-01.jpg|link=G-2|The USS [[G-2]] shown taking a crew photo while at the Brooklyn Navy Yard on June 27, 1917.
File:G2-g2bny1-01.jpg|link=G-2|The USS [[G-2]] shown taking a crew photo while at the Brooklyn Navy Yard on June 27, 1917.
Line 18: Line 18:


</gallery>
</gallery>
[[G-2|See More USS G-2 Boats]]
<div style="text-align: left;">[[G-2|See more G-2 photos]]</div>
[[File:Red bar sub.jpg]]<br><br>
[[File:Red bar sub.jpg]]<br><br>


==USS G-3==
=== <big>G-3 (Submarine No. 31)</big> ===
[[File:Red bar sub.jpg]]
[[File:G3-5g3a-01.jpg|left|thumb|250px|Launching Turbot December 27, 1913 Lake Torpedo Boat Co., Bridgeport, Conn.]]
[[File:G3-5g3a-01.jpg|link=G-3|thumb|250px|Launching USS Turbot ([[G-3]]) December 27, 1913 Lake Torpedo Boat Co., Bridgeport, Conn.]]
<div style="text-align: justify;"><span style="color:#00008B">Picture caption to go here.</span><br><br>
[[File:G3-3g3a-02.jpg|link=G-3|left|thumb|250px|USS [[G-3]] hauled out at Bridgeport, Conn, December 1915.]]
<div style="text-align: left;">[[G-3|See more G-3 photos]]</div>
 
[[File:Red bar sub.jpg]]<br>
Vivamus eget ante eget ipsum consequat pellentesque. Ut sed bibendum leo. Etiam semper turpis metus, eget condimentum nibh feugiat sit amet. Vestibulum commodo urna erat, non faucibus ante rhoncus cursus. Vivamus faucibus mi et neque mattis sagittis eu sit amet lacus. Maecenas non volutpat erat.
=== <big>G-4 (Submarine No. 26, later SS-31)</big> ===
 
 
 
 
 
 
 
 
[[G-3|See More G-3 Boats]]
==USS G-4==
[[File:Red bar sub.jpg]]
Mauris iaculis lacus maximus, elementum eros ullamcorper, ultrices tortor. Pellentesque convallis lacinia justo, ac iaculis justo aliquet eget. Nulla sem neque, auctor a elit ornare, malesuada eleifend ipsum.
 
[[File:G4-g4fittingout-01.jpg|link=G-4|300px|left]]
[[File:G4-g4fittingout-01.jpg|link=G-4|300px|left]]
 
<div style="text-align: justify;"><span style="color:#00008B">The USS [[G-4]], seen on October 2, 1912, at the Cramp yard going through her 'fitting out' period where she will receive a majority of her piping, electrical and internal systems and habitability features. Vivamus faucibus mi et neque mattis sagittis eu sit amet lacus.</span><br><br>
 
<div style="text-align: left;">[[G-4|See more G-4 photos]]</div>
The USS [[G-4]], seen on October 2, 1912, at the Cramp yard going through her 'fitting out' period where she will receive a majority of her piping, electrical and internal systems and habitability features. Vivamus faucibus mi et neque mattis sagittis eu sit amet lacus.
 
 
 
 
 
 
 
 
 
 
[[G-4|See More G-4 Boats]]
[[File:Red bar sub.jpg]]
[[File:Red bar sub.jpg]]

Revision as of 21:50, 3 May 2023

Design, Construction, and Naming Notes

The four G-class harbor defense submarines were not actually a class at all. They were built to four completely different designs, but they were intended to have similar military characteristics, so they were grouped together. They were named Seal, Tuna, Turbot, and Thrasher when ordered, but their names were all changed to the G-class names on November 17, 1911, well before any of them had been commissioned. G-1 and G-2 were of a related Lake Torpedo Boat Co. design and were built by the Newport News Shipbuilding & Drydock Co. in Newport News, VA. G-3 was of a modified Lake design whose construction was started at the Lake company yard in Bridgeport, CT. Lake ran into severe financial difficulties and declared bankruptcy, so G-3 had to be towed to the New York Navy Yard for completion. G-4 was an ill-advised attempt to introduce competition to the submarine acquisition process, being built to an Italian Laurenti design at William Cramp & Sons Shipbuilding Co. in Philadelphia, PA. Due to the haphazard process that the Navy used to award the contracts, the hull numbers assigned to these boats fell out of sequence. None of these boats were considered successful, spending an average of just six years in service before being decommissioned and disposed of.

G-1 represents a unique anomaly in the USN. Her development and construction was so troubled that the Navy was very unsure if they would even accept it. When it did eventually pass acceptance trials, the Navy awkwardly assigned it hull number 19½, the only time in its entire history that the Navy assigned half a hull number to a commissioned warship. When the USS F-1 (Submarine No. 20) was lost in a collision, the Navy took another unprecedented step and reassigned the F-1's hull number to G-1. She was eventually redesignated in the SS series, but not long after she was disposed of as a depth charge target


G-1 (Submarine No. 19½, later SS-20)

Submarine Seal, February 8, 1911.
Simon Lake's submarine Seal is shown here shortly after her launch from Newport News Shipbuilding, Virginia on February 8, 1911. It would be nearly another two years before she was commissioned into the United States Navy, and then only reluctantly. During this fitting out period her name was changed to G-1.

See more G-1 photos






G-2 (Submarine No. 27)



G-3 (Submarine No. 31)

Launching Turbot December 27, 1913 Lake Torpedo Boat Co., Bridgeport, Conn.
Picture caption to go here.


G-4 (Submarine No. 26, later SS-31)

The USS G-4, seen on October 2, 1912, at the Cramp yard going through her 'fitting out' period where she will receive a majority of her piping, electrical and internal systems and habitability features. Vivamus faucibus mi et neque mattis sagittis eu sit amet lacus.