<div style="text-align: justify;"><span style="color:#00008B">It was originally intended to build two additional copies of the preceding Dolphin design for the final two V-boats. But, bowing to pressure from international treaties that limited total submarine displacement, and by strong advocacy from small-submarine elements within the Submarine Officer's Conference and the General Board, the two Fiscal Year 1932 boats were built to a smaller size and displacement. Cachalot's construction was assigned to Portsmouth, and Cuttlefish was contracted to Electric Boat, breaking a seven-year gap in construction for EB.
<div style="text-align: justify;"><span style="color:#00008B">It was originally intended to build two additional copies of the preceding Dolphin design for the final two V-boats. But, bowing to pressure from international treaties that limited total submarine displacement, and by strong advocacy from small-submarine elements within the Submarine Officer's Conference and the General Board, the two Fiscal Year 1932 boats were built to a smaller size and displacement. Cachalot's construction was assigned to Portsmouth, and Cuttlefish was contracted to Electric Boat, breaking a seven-year gap in construction for EB.


In the original construction authorization for the V-class dating back to 1916, these two boats were known as V-8 and V-9. However, by the time the construction contracts were signed, their names had been changed to comply with the new naming system. Thus, these boats never officially carried the V-class names.
In the original construction authorization for the V-class dating back to 1916, these two boats were known as V-8 and V-9. However, by the time the construction contracts were signed, their names had been changed to comply with the new naming system. Thus, these boats never officially carried the V-class names. Although bearing little resemblance to the other V-class submarines, their construction was authorized by the same act of Congress that funded the other seven boats, so they are considered part of the V-class by most historians.


EB was eager to get back into the submarine construction business, so they asked for and received permission to make several changes to the basic design as developed by the USN Bureau of Construction & Repair. They were able to provide separate crew's berthing and messing, and they expanded the use of welding in the hull fabrication, although both Cachalot and Cuttlefish were built to a [https://pigboats.icci.llc/images/3/37/NO_MORE_HEADS_OR_TAILS_TSR_version.pdf '''partial riveted/partial welded construction method''']. Cuttlefish was also the first boat in the fleet to receive an air-conditioning plant, with its use so successful that all of the fleet submarines were subsequently refitted with one, and all future boats were built with a plant as original equipment. The Torpedo Data Computer (TDC), a mechanical computer used to provide a firing solution for torpedoes, was first tested in these boats, proving the concept.
EB was eager to get back into the submarine construction business, so they asked for and received permission to make several changes to the basic design as developed by the USN Bureau of Construction & Repair. They were able to provide separate crew's berthing and messing, and they expanded the use of welding in the hull fabrication, although both Cachalot and Cuttlefish were built to a [https://pigboats.icci.llc/images/3/37/NO_MORE_HEADS_OR_TAILS_TSR_version.pdf '''partial riveted/partial welded construction method''']. Cuttlefish was also the first boat in the fleet to receive an air-conditioning plant, with its use so successful that all of the fleet submarines were subsequently refitted with one, and all future boats were built with a plant as original equipment. The Torpedo Data Computer (TDC), a mechanical computer used to provide a firing solution for torpedoes, was first tested in these boats, proving the concept.
Line 14: Line 14:
=== <big>Cachalot (SS-170)</big> ===
=== <big>Cachalot (SS-170)</big> ===
[[File:Cachalot black.jpg|left|thumb|U.S. Navy photo]]
[[File:Cachalot black.jpg|left|thumb|U.S. Navy photo]]
<div style="text-align: justify;"><span style="color:#00008B">Cachalot underway in the mid 1930's</span>
<div style="text-align: justify;"><span style="color:#00008B">Cachalot underway in the mid 1930's. She was the lead boat of the last group of the V-class.</span>


[[170|See more Cachalot photos]]
[[170|See more Cachalot photos]]
Line 22: Line 22:
=== <big>Cuttlefish (SS-171)</big> ===
=== <big>Cuttlefish (SS-171)</big> ===
[[File:Cuttlefish port side.jpg|left|thumb|NARA photo #19-N-15260 via Navsource.org]]
[[File:Cuttlefish port side.jpg|left|thumb|NARA photo #19-N-15260 via Navsource.org]]
<div style="text-align: justify;"><span style="color:#00008B">Cuttlefish on post commissioning trials, late summer of 1934.</span>
<div style="text-align: justify;"><span style="color:#00008B">Cuttlefish on post commissioning trials, late summer of 1934. The last of the pathfinding V-class boats, she marked the return to the fold of the Electric Boat Company.</span>


[[171|See more Cuttlefish photos]]
[[171|See more Cuttlefish photos]]


[[File:Red bar sub new 2.jpg]]
<center>[[V-class|Return to the V-class page]] | [[Submarine Classes|Return to the Submarine Classes page]]</center>
[[File:Red bar sub new 2.jpg]]
[[File:Red bar sub new 2.jpg]]
<center>
<center>

Revision as of 18:56, 22 June 2023

Design and Construction Notes

It was originally intended to build two additional copies of the preceding Dolphin design for the final two V-boats. But, bowing to pressure from international treaties that limited total submarine displacement, and by strong advocacy from small-submarine elements within the Submarine Officer's Conference and the General Board, the two Fiscal Year 1932 boats were built to a smaller size and displacement. Cachalot's construction was assigned to Portsmouth, and Cuttlefish was contracted to Electric Boat, breaking a seven-year gap in construction for EB.

In the original construction authorization for the V-class dating back to 1916, these two boats were known as V-8 and V-9. However, by the time the construction contracts were signed, their names had been changed to comply with the new naming system. Thus, these boats never officially carried the V-class names. Although bearing little resemblance to the other V-class submarines, their construction was authorized by the same act of Congress that funded the other seven boats, so they are considered part of the V-class by most historians.

EB was eager to get back into the submarine construction business, so they asked for and received permission to make several changes to the basic design as developed by the USN Bureau of Construction & Repair. They were able to provide separate crew's berthing and messing, and they expanded the use of welding in the hull fabrication, although both Cachalot and Cuttlefish were built to a partial riveted/partial welded construction method. Cuttlefish was also the first boat in the fleet to receive an air-conditioning plant, with its use so successful that all of the fleet submarines were subsequently refitted with one, and all future boats were built with a plant as original equipment. The Torpedo Data Computer (TDC), a mechanical computer used to provide a firing solution for torpedoes, was first tested in these boats, proving the concept.

While generally successful, these boats were ultimately too small and had too short a range for the role of operating with the fleet in the vast Pacific. After several non-productive war patrols in the early months of WWII, they were retired back to the States and served well as training boats for the remainder of the war.

Cachalot (SS-170)

U.S. Navy photo
Cachalot underway in the mid 1930's. She was the lead boat of the last group of the V-class.

See more Cachalot photos

Cuttlefish (SS-171)

NARA photo #19-N-15260 via Navsource.org
Cuttlefish on post commissioning trials, late summer of 1934. The last of the pathfinding V-class boats, she marked the return to the fold of the Electric Boat Company.

See more Cuttlefish photos

Return to the V-class page | Return to the Submarine Classes page

Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster at pigboats dot com