O-1: Difference between revisions
From PigBoats.COM
Pbcjohnston (talk | contribs) Updated photo and added caption |
Pbcjohnston (talk | contribs) Added new Header |
||
Line 1: | Line 1: | ||
[[File:Header | [[File:New Header O-class.jpg]] | ||
[[File:O-1 dd 1918.jpg|left|500px]] | [[File:O-1 dd 1918.jpg|left|500px]] |
Latest revision as of 19:16, 14 March 2025

O-1 in drydock at the Portsmouth Navy Yard, Kittery, ME., September 5, 1918. The Navy's Bureau of Construction & Repair (C&R) was able to obtain a license from Electric Boat to build two submarines to their design at Navy yards. O-1 was one of them. She is shown here two months before her commissioning, undergoing final work in preparation to be accepted by the Navy.
Return to the O-class page | Return to the Submarine Classes page
Photo NH 46712 courtesy of NHHC.
Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster at pigboats dot com