G-4 was an attempt to introduce competition to the submarine acquisition process in the years immediately before WWI. Authorized in Fiscal Year 1910 along with Lake's Turbot, Thrasher (later G-4) was built to an Italian design by naval architect Cesare Laurenti, whose engineering work for the Italian Navy had gained some recognition. The top diagram shows the original design by Laurenti, and it had significant differences from the boat that was actually built for the USN, as shown in the second diagram. The biggest differences are in the arrangement of the battery wells, the engines, and the aft torpedo tubes. The first drawing shows the Laurenti design with the after battery all the way in the stern, aft of the engines, which would prevent the placement of aft torpedo tubes. It also shows at least two extra engines and hatches in different locations. Whether these significant changes in the G-4's internal arrangement reflect a maturation of the Laurenti design, or if they were made at the insistence of the USN before the boat would be built is not known at this time.

Laurenti contracted with the William Cramp & Sons Shipbuilding Co. in Philadelphia for construction. The design as built had two forward 18" torpedo tubes that were situated below the elongated bow, with two more aft under an overhanging flat "shovel" shaped stern. These aft tubes were the very first aft firing tubes in a USN submarine. She was a double hull boat, with an inner elliptically shaped pressure hull wrapped by a flattened circle shaped outer hull. Two fixed height periscopes were fitted forward of the conning tower. She also had two rudders, one below the stern and a smaller one topside on the aft deck. G-4 suffered from numerous mechanical and stability problems and was not considered successful, despite being liked by her crews. She was the only submarine built to a foreign design ever commissioned into the USN.

Drawing by Jim Christley, courtesy of Navsource.org


The launch of the G-4 was a near disaster that was narrowly averted. She quickly corrected her list once she was fully off the cradle, but not before two yard workers went into the water and needed to be rescued by a nearby boat. Cramp and the Navy got lucky. It could have been much worse.

Cramp was an experienced shipbuilder whose personnel were very familiar with stability calculations and the physics of floating ship hulls. With that said, the cause of this incident was likely due to the unusual Laurenti design itself, whose stability due to the unusual hull form was questionable. Stability issues would plague G-4 throughout her operational career. She was hard to sail properly, proving difficult for her crew to handle both surfaced and submerged.

G-4 at the Cramp yard during her fitting out period, fall of 1912. This is a good overhead view of some of her more unusual features. The bow planes lay flat on the fore deck. They fold out and down and lock on to an axle that then rotates the planes to dive and rise positions. Although hard to see at the stern, the stern planes operate like the bow planes and are partly extended. The port plane can be seen as a square shape just forward of the "doghouse" on the stern. The starboard plane is actually seen edge on, but its reflection can be seen in the water and you can se its square shape there. In the fully extended position both sets of planes would be flat to the water. Cramp yard slipways can be seen in the background.

National Archives photo.

G-4 on October 2, 1912, at the Cramp yard going through her fitting out period, with this photo likely taken at about the same time as the one above. During this post-launch phase of her construction she will receive a majority of her piping, electrical and internal systems, and habitability features. On the right near the bow the anchor hawse pipe can be seen, with an anchor chain running aft into an enclosed locker. This locker housed the anchor itself, attached to a "billboard" style release mechanism. The locker doors had to be opened to release the anchor. Billboard style anchor mounts were common on surface ships of this time, but very unusual on submarines.

Photo NH 43799 courtesy of the Naval History & Heritage Command.

A few of the workmen from the Cramp yard that built the G-4. Seen here are yard officials, shop and department supervisors, and the craftsmen who were putting the G-4 together. Commissioning was still 14 months away.

Photo NH 73381 courtesy NHHC.

A nice photo of G-4 from the stern at sea prior to WW I, approximately 1914, along with two closeups. The position of the upper rudder says that the submarine is making a left turn, and this could explain the starboard list, although G-4 was known to have stability issues. The middle picture is a closeup of the stern, showing details of the topside rudder, folded up stern planes, and the open aft torpedo room hatch. Both the stern and bow diving planes had to be manually rigged out by sending a crewman topside prior to diving, a dangerous evolution in anything other than a calm sea. The third photo is a closeup of the conning tower fairwater and bridge structure. The commissioning pennant is flying from the radio mast. The officer on the right is most likely the boat's Commanding Officer, LT Ernest D. McWhorter, a Navy Cross awardee later in WWI.

Photo from the Rick Larson Collection, now in the private collection of Ric Hedman.

Two photos of G-4 at sea, most likely pre-WW I, circa 1914-15. Note the Allied signal bell on the fore deck aft of the hatch and the upper rudder all the way to the right, behind the two men. In the second photo, taken shortly after the first one, G-4 is burying her bow in a head sea. The bow is to the left in these photos, and the unusual arrangement of her periscopes, forward of the conning tower fairwater, is plainly visible.

National Archives photos.

Ship's officers and crew posed on deck, 1917. G-4 was operating out of Submarine Base New London, CT. at the time. The two officers (4th & 5th from left, front row) are LT(jg) Paul F. Foster (Commanding Officer) and LT(jg) William F. Callaway (Executive Officer).

National Archives photo.

One of G-4's crew whose name has unfortunately been lost to the ages. He is in his dress blues, wearing the traditional "flat hat" with the G-4 name on it. The rate insignia on his left arm is unclear, but it may be for a Machinist Mate or Motor Machinist Mate 1st Class. His spirits are obviously high, with a self-assured smile and a countenance of confidence that is the hallmark of a sailor Qualified in Submarines.

Photo in the private collection of Ric Hedman

Ensign Paul Frederick Foster, USN, photographed circa 1914. Foster was born on March 25, 1889 in Wichita, Kansas. He received a senatorial appointment from the state of Idaho to the U.S. Naval Academy. Following graduation in 1911, he served on the cruiser Washington (Armored Cruiser No. 11) and the battleship Utah (BB-31) as a midshipman. In March 1912, was commissioned as an Ensign. On 21-22 April 1914, Foster participated at the intervention at Vera Cruz, Mexico, leading his landing company with skill and courage. For his "distinguished conduct in battle", he was awarded the Medal of Honor.

After submarine instruction on board the auxiliary cruiser USS Prairie, he reported on board the G-4. In March 1915, Foster was promoted to Lieutenant Junior Grade and, in early 1916, was given command of G-4.

Relocating to Ireland in December 1917, he was assigned to the submarine tender Bushnell (Submarine Tender No. 2) in Bantry Bay, Ireland. Foster was temporarily promoted to Lieutenant in May 1918. While serving in Irish waters, he took command of the submarine L-2 (Submarine No 41). Lieutenant Foster was awarded the Distinguished Service Medal for his role in the sinking of the German submarine UB-65 off the Irish coast on 10 July 1918.

National Archives photo.

Photographed looking aft on board the G-4, Commanding Officer LT(jg) Paul F. Foster, circa 1915-1916. G-4 looks to be a wet boat on the surface. There is a stiff breeze blowing to port, and Foster stands with a stance typical of an experienced sailor, braced against the boat's roll and against the breeze.

National Archives photo.

G-4's officers standing beside their boat at Submarine Base New London, CT. in 1917. They are LT(jg) William F. Callaway (Executive Officer), at left, and LT(jg) Paul F. Foster (Commanding Officer).

National Archives photo.

Return to the G-class page | Return to the Submarine Classes page

Page created by:
Ric Hedman & David Johnston
1999 - 2023 - PigBoats.COM©
Mountlake Terrace, WA, Norfolk, VA
webmaster@pigboats.com